Wallbridge – Piling and Dredging – March to July 2016
Posted on 05. Jul, 2016 by Philip in Environment & Nature, Featured
Cotswold Canals write: Thames & Severn Canal, Wallbridge Upper pound. Contractors “Land & Water” carrying out piling to prevent further landslips, and dredging to reopen the section of canal from Wallbridge Upper lock to the road bridge at Dr Newton’s Way. This joins the new concrete section of canal between the railway viaduct at Capel Mill and Arundel aqueduct.
https://www.facebook.com/CCTFriends https://twitter.com/cotswoldcanals